All posts
30 October 2026#modernisation#strategy#case-study

Breaking the rule: migrating 25+ apps from Angular to React, framework and UI at once

How we migrated more than 25 applications from Angular to React and onto a new design system at the same time for one of Europe's largest e-commerce platforms. An AI-assisted pipeline cut each migration from months to weeks, which made doing both at once the better path.

8:27
Chieh GerSoftware Engineer, DevOptix
Breaking the rule: migrating 25+ apps from Angular to React, framework and UI at once

We migrated the frontend of one of Europe's largest e-commerce platforms to a new framework and a new design system at the same time, as part of the platform's own migration team. Conventional wisdom says you never do both together, and normally we agree. Gradual, piece-by-piece replacement, often called the Strangler Fig pattern, is our default advice for a reason.

This time, we took a different path. We rewrote the framework and the UI at the same time, and it turned out to be the safer choice, not a reckless one. What used to take one to two months per application came down to one to two weeks, with an AI-assisted pipeline we built along the way. A migration team of three moved more than 25 applications from Angular to React in about six months, on top of the first ones we migrated by hand.

Here's why the standard rule flipped, how we kept the launch safe, and where we deliberately kept people in control instead of automating further.

Why we broke "never rewrite the framework and the UI together"

Phasing out an application incrementally, running old and new components side by side, is usually the right call. It avoids a massive, single-step launch and lets you ship value continuously.

But that approach breaks down when the UI library itself needs a complete overhaul. Running legacy styles alongside a brand-new in-house design system on the same screen, page by page, over months, means shipping a visually fractured product to customers for the entire migration window.

Teams accept that cost because the alternative used to be slower and riskier. When rewriting an application by hand takes one to two months, a full rewrite is a long stretch with nothing shipped, and a gradual rollout is the safer bet. AI changed that calculation. With our pipeline bringing each application down to one to two weeks, a full rewrite stopped being the slow option, and the fractured transition stopped being worth it. For more and more teams, doing both at once is becoming the better path.

So we inverted the approach. We built the new application in full isolation on its own environment, while the live application kept running untouched. We cut over all at once, when it was ready, rather than screen by screen.

The lesson for anyone facing a similar scenario: the rule against a full rewrite assumes the rewrite takes months. When AI tooling shortens it to weeks, and two major elements are changing at once, a slow rollout can be the more visible and damaging risk.

How we made a complete cutover safe

A launch of this size only works if you remove as much risk as possible beforehand, and ensure you can undo it quickly if something goes wrong.

We built the new application in complete isolation on staging while the live application stayed in production, untouched. There was no shared code, no shared state, and no risk to end users while the work was in progress. The build phase carried close to zero production risk because nothing customer-facing depended on unfinished work. We developed the React application against the backend's OpenAPI specification, so the old and new builds spoke the same contract.

Naturally, the cutover itself is where the risk concentrates. Switching an entire customer-facing application in one move means any defect missed in testing reaches every user at once. We treated that moment accordingly. The switch happened per application, and it was literally a flag in the pipeline that switched it from Angular to React. We kept the Angular project in the repository for a week after deploy, and flipped the same switch if we needed to revert. There were findings after go-live, but nothing too critical, and we only needed to revert like that a handful of times. Near-zero risk during the build, plus a known, bounded risk at launch backed by an immediate way back: that is what made the approach safe.

We also ran this without a dedicated QA function. Responsibility for correctness sat with the engineers building each part of the new application, testing their own and each other's work against the live legacy application before sign-off, with side-by-side comparison, visual regression checks and end-to-end tests. That worked because the isolated setup gave them a clean, low-noise environment to test against, and because ownership of quality stayed with the people who understood the code best.

How AI made an impact

The early phase of the migration was entirely manual. We rewrote a handful of applications, small and large, by hand before writing any automation. This wasn't wasted overhead. It was the only way to establish the exact patterns an automated tool could later repeat reliably, learning how legacy logic should map onto the new stack and where the edge cases actually live.

Only once those patterns were proven did we build an internal tool to apply them at scale. We split the work across a small pipeline of specialised automated steps rather than relying on one large, unpredictable pass per application, and we set it a target of 80% of the remaining migration work.

Why 70% and not 80%? We still wanted the majority of the code generated by the pipeline, but we wanted people to view, test and review that code, both for fixes and for deployments. Looking back, the split was probably nearer 70/30. That gap wasn't a flaw we had to compromise on; it was a deliberate choice. It is where people caught the nuanced mistakes an automated system can plausibly make, and handled the bespoke deployment configuration specific to each team's application. Automation handles the repeatable part; people own the part that requires human judgement. That split is what allowed the business to trust the timeline.

The result: what used to take one to two months per application now takes one to two weeks.

Handing over to the teams that own the code

As the migration team, we only fixed the findings from each application's initial migration. Once we handed an application over to the operational team it belonged to, we moved into a guidance role instead. We wanted those teams to get familiar with the codebase, the design and the structure themselves, because they are the ones who will run it.

What this means if you're facing a similar migration

  1. The "never do both at once" rule has conditions. It holds up when a rewrite takes months and the incremental transition is seamless enough to live with. When two major changes collide, like a framework and a design system, AI tooling brings a rewrite down to weeks, and a slow rollout would mean shipping an inconsistent product, ask whether a fully isolated rebuild with a fast, reversible cutover is actually the safer path.
  2. Prove the pattern by hand before you automate it. Ask your team to migrate a representative handful of cases manually first. That's how you uncover the mapping rules and edge cases an automated tool needs to get right before running it at scale.
  3. You don't need a dedicated QA function to move fast safely, but you do need real isolation. Developer-owned testing worked here because the new application never touched production while being built. Ask where quality ownership sits in your own migrations, and whether your environment actually gives people a safe place to own it.
  4. Decide your automation ceiling on purpose, and defend it. Aiming for 80% and landing nearer 70%, so people could review every change, is a stronger, more credible strategy than claiming full automation. When evaluating an AI-assisted migration, always look for the intentional human-review boundary, not just the headline coverage number.

Facing a migration where going gradually means months of a product that looks half-finished? Talk it through with us before you pick the path.

Talk to us

Keep reading